Skip to Content
Technical OverviewDeveloper Planning and Roadmap

Developer Planning and Roadmap

Phase 0: Preparation & Kick-off

Duration: 2 weeks

Goals: align team, finalize scope, set up infrastructure

Tasks:

  • Project Kick-off Workshop
  • Review overall vision, scope, success criteria
  • Confirm responsibilities (Web, Mobile, AI, Hardware, DevOps, QA)
  • Architecture & Tech Stack Review
  • Finalize versions of React/Next.js, Tauri, SwiftUI, Raspberry Pi OS, Pytorch, etc.
  • Set up shared CI/CD pipelines, code repos, issue trackers
  • Environment Provisioning
  • Create base GitHub org, repositories & branch policies
  • Configure Trello/Confluence boards per component
  • Provision Raspberry Pi devices, test benches, Cloud dev servers

Deliverables: Project charter; repo skeletons; initial CI pipeline; hardware bench setup


Phase 1: Data & Embedding Model

Duration: 6 weeks

Goals: build recipe dataset; train & validate autoencoder embeddings

Tasks:

  1. Dataset Assembly (2 weeks)
  • Ingest 500K recipes from Food.com & RecipeNLG
  • Standardize schema: ingredients, steps, metadata, dietary labels
  • Enrich ingredients with USDA & Open Food Facts nutritional data
  • Validate and filter for quality (duplicates, missing fields)
  1. Model Architecture & Training (3 weeks)
  • Prototype autoencoder on sample subset
  • Iterate architecture (embedding size, layer depth, regularization)
  • Train full-scale model; monitor loss and reconstruction quality
  • Unit tests for vector operations (addition, interpolation)
  1. Evaluation & Application (1 week)
  • Recipe classification, clustering, and generation demos
  • Documentation of embedding interface & performance metrics

Deliverables: cleaned, versioned dataset; trained autoencoder weights; evaluation report; embedding API spec


Phase 2: Smart-Kitchen Hardware Prototype

Duration: 8 weeks (overlaps Phase 1)

Goals: build Kivy Hub prototype; implement gesture mapping

Tasks:

  1. Hardware Assembly & Mounting (1 week)
  • Procure HY320 projector, camera, Raspberry Pi 5, mounts
  • Assemble and cable devices; ensure stable mounting
  1. Camera–Projector Calibration (2 weeks)
  • Capture calibration images; compute homography transform
  • Integrate MediaPipe for hand‐landmark detection
  1. Local Processing Workflow (2 weeks)
  • Install and optimize Python, MediaPipe, OpenCV on Pi
  • Build homography + gesture‐to‐UI mapping module
  1. UI Projection & Interaction Demo (3 weeks)
  • Develop minimal Tauri web app showing buttons/sliders
  • Integrate gesture events into UI components
  • Iterative user tests to refine responsiveness & accuracy

Deliverables: fully functional Pi prototype; gesture‐UI library; calibration docs


Phase 3: Web & Embedded Application

Duration: 6 weeks

Goals: develop production-ready Tauri app and Next.js documentation site

Tasks:

  1. Core UI Components (2 weeks)
  • Build React primitives: Tap, Swipe, Hold components
  • Style with Tailwind; ensure responsive grid layout
  1. Kitchen Tools Module (2 weeks)
  • Implement timer, measurement overlay, cutting guide
  • Hook tools into gesture components
  1. AI Hub & Recipe Viewer (1 week)
  • Connect embedding API for “smart suggestions”
  • Integrate recipe viewer: paginated steps, ingredient highlights
  1. Documentation Website (1 week)
  • Next.js site with Nextra for all technical docs
  • Internationalization via Lingui; formula support with KaTeX

Deliverables: Tauri binary; Next.js documentation site live; component library


Phase 4: Mobile Nutrition App

Duration: 10 weeks (overlaps Web)

Goals: deliver iOS-grade SwiftUI app with AI recommendations & HealthKit sync

Tasks:

  1. Home Dashboard & Widgets (2 weeks)
  • Build customizable dashboard; widget drag-drop reorder
  • Connect HealthKit for steps/calories read
  1. Recipe & Social Feed (2 weeks)
  • Feed UI; comment/save/share flows
  • Generate shopping list from selected recipes
  1. Goals Tracking Module (2 weeks)
  • Calorie needs calculator (age, weight, height, activity)
  • Trends charts for nutrition & activity
  1. Advanced Search & Personalization (2 weeks)
  • Keyword & filter search against recipe dataset
  • Allergy/dietary preferences settings
  1. Settings & Integrations (2 weeks)
  • Manage HealthKit permissions, push notifications
  • Profile, privacy, dietary preferences

Deliverables: TestFlight beta release; user feedback report; app store submission prep


Phase 5: Kivy Dev API & Backend

Duration: 6 weeks

Goals: build token‐based API, secure backend, developer docs

Tasks:

  1. API Design & Auth (1 week)
  • Define endpoints: embeddings, recipe search, personalization
  • JWT token flows, rate limiting via NestJS & Passport
  1. Data Layer & Caching (2 weeks)
  • DrizzleORM models for recipes, users, analytics
  • Redis + BullMQ for asynchronous tasks (notifications, content generation)
  1. Security & Hardening (1 week)
  • Enforce HTTPS, JWT expiry, bcrypt-salted passwords
  • Audit for SQL-injection, XSS, CSRF
  1. Developer Portal & Docs (2 weeks)
  • Next.js/API reference with code samples
  • Interactive API key management UI

Deliverables: live API endpoints; Postman collection; developer portal


Phase 6: Testing, QA & Performance

Duration: 6 weeks (ongoing overlap)

Goals: ensure stability, security, performance across all components

Tasks:

  • Automated Test Suites
  • Backend e2e tests (NestJS + Supertest)
  • UI tests (Playwright for web & mobile prototypes)
  • Performance Benchmarking
  • Load test APIs; measure latency under 100 ms per call
  • Memory-profiling on Raspberry Pi & SwiftUI app
  • Security Audits
  • Penetration testing of web endpoints
  • Review mobile storage encryption & keychain

Deliverables: test coverage reports; performance dashboards; security audit summary


Phase 7: Beta Launch & Feedback

Duration: 4 weeks

Goals: iterative refinement based on real user input

Tasks:

  • Release web app and hardware demo to pilot users
  • Distribute TestFlight invites & collect feedback via in-app surveys
  • Triage bug reports, usability issues; schedule sprints for fixes

Deliverables: bug backlog; UX improvement plan; updated builds


Phase 8: Commercial Launch & Monitoring

Duration: 4 weeks

Goals: public release, marketing, operational readiness

Tasks:

  • Finalize packaging for Kivy Hub; coordinate manufacturing logistics
  • App Store & web launch campaigns; press release
  • Set up monitoring: Sentry for errors, Grafana dashboards for API usage

Deliverables: launched product; marketing collateral; monitoring alerts configured


Phase 9: Maintenance & Roadmapping

Ongoing

  • Support & Updates: monthly sprints for bugfixes and enhancements
  • Feature Roadmap: plan Godot-based web re-implementation, Android support
  • Community & Dev Evangelism: webinars, SDK expansions

Timeline Summary

PhaseWeeksCalendar (approx.)
0. Prep & Kick-off2Dec 1 – Dec 14, 2024
1. Data & Embedding Model6Dec 15, 2024 – Jan 26, 2025
2. Hardware Prototype8Dec 15, 2024 – Feb 9, 2025
3. Web & Embedded App6Jan 27, 2025 – Mar 9, 2025
4. Mobile App10Dec 15, 2024 – Feb 23, 2025
5. API & Backend6Mar 10 – Apr 20, 2025
6. Testing & QA6Feb 10 – Mar 23, 2025
7. Beta Launch & Feedback4Apr 21 – May 18, 2025
8. Commercial Launch & Monitoring4Sep 19 – Oct 17, 2025
9. Maintenance & Roadmappingongoingfrom Oct 18, 2025 onward
Last updated on